RETROFIT & REFURBISHMENT · FINISHES

Turn a room list into a finish purchase schedule.

Separate retained surfaces, preparation and new finishes before calculating tile boxes and comparing installation packages.

TrendyBuilders editorial team · Reviewed 29 November 2026 · Worked examples

Use the room as a reference, not the only measure

In a home refurbishment or retrofit, the same room can contain surfaces to retain, remove, prepare and refinish. Begin a schedule with a room or zone reference. Then list each actual work surface: floor, individual wall, reveal or other measured item. Avoid applying one room area to several different trades.

Record the condition assumption

For each item, describe the proposed finish and what is assumed about the surface beneath it. Removal, disposal, protection, levelling and repair may have separate costs. Unknown conditions should remain explicit pending review; a calculator cannot inspect a substrate or identify concealed defects.

Work through the tile purchase

The demo floor is 6 × 5 = 30 m². A chosen 10% allowance produces 33 m². With a stated box coverage of 1.44 m², 33 ÷ 1.44 gives 22.92 boxes, rounded up to 23 whole boxes. Purchased coverage is therefore 33.12 m².

At the illustrative EUR32 per box, those boxes cost EUR736. The figure is for tile boxes only. It excludes adhesive, grout, trims, preparation, labour, delivery and tax. Check a supplier’s actual box coverage and product specification; similar-looking tiles may be sold in different quantities.

Review layout before ordering

The chosen allowance is an editable assumption. Room shape, cut positions, pattern, openings and a decision to retain spare material can change the purchase plan. Review these points with the installer and supplier rather than treating a default percentage as universal.

Make the quotation answer the schedule

  • Identify product or agreed specification for each surface.
  • State measured area, allowance and purchase quantity separately.
  • Show preparation and installation inclusions next to the finish.
  • Record supply responsibility, delivery and any unresolved selection.

A finish schedule helps explain differences between quotations. It does not establish product suitability, retrofit performance or project compliance; those decisions require the appropriate project review.

Explore the TB calculators

YOUR NEXT EXTENSION, REFURBISHMENT OR MATERIAL ORDER

Bring the working detail into your next estimate.

Explore construction quantities, purchasing, editable costs and resource planning in TrendyBuilders. Find a plan for your own work or your team.

Make every allowance explainable.See plans